|
Serial Number
|
process
|
project
|
notes
|
|
1
|
Check the status of the machine/clean the machine
|
|
|
|
2
|
paint
|
|
According to customer requirements configuration colour
|
|
3
|
Oil system renovation and upgrading
|
Automatic lubrication at the knife box
|
Optional
|
|
4
|
Sheet metal design and ordering
|
|
Coordinate design proposals with clients
|
|
5
|
Mechanical processing/assembly
|
|
Marking and adaptation of various parts
|
|
6
|
Sheet metal installation
|
|
Bottom oil proof treatment installation
|
|
7
|
electrical installation
|
|
|
|
8
|
System commissioning
|
Matching processing of systems, motors, and mechanical structures
|
|
|
9
|
accuracy testing
|
repeatability
|
|
|
10
|
Machine running in
|
Continuous operation for 72 hours with full travel break in
|
|
|
11
|
Sample testing report for machine inspection products
|
Length, diameter, chamfer, arc
|
Customers can provide product samples for testing
|
|
12
|
Customer inspection and delivery
|
|
Customer on-site testing and initial acceptance
|